This project includes providing a new build community centre incorporating community hall and football club changing facilities in the centre of Minehead. Working with the architects, Louise Crossman Architects, we are providing full Quantity Surveying services to the client including budget estimates, contract documentation and post-contract services. Work commenced in the summer of 2019 and has completed.
© Images Copyright WT Hills Ltd.
We are working with Stan Bolt: Architect as Quantity Surveyors on this project in South Devon near to the River Dart. This new build residential house sits on an existing plot and will mainly be single storey with a two storey annex and car port. The property is 372m2 and includes external copper and timber cladding alongside stone, timber and render finishes. Extensive glazing alongside pleasant external terraces will enable the owners to enjoy the beautiful views from inside and out. This project commenced at the start of 2019 and completed in the summer of 2020.
© Images Copyright WT Hills Ltd.
This agricultural barn is being converted into a two storey residential property utilising the existing steel portal frame and layout. To be clad in timber shingles from a local sustainable source the building will also utilise renewable energy sources such as PV cells and a ground source heat pump. The new property will have a timber clad SIPS structure with extensive glazing, solid concrete ground floor and other features including large timber external sliding louvred screens. Designed by David Sheppard Architects, construction commenced in October 2017 and we are providing full post contract Quantity Surveying services in addition to the agreement of costs and drawing up contract documentation. We are also acting as Principal Designer on this scheme.
© Images Copyright WT Hills Ltd. & L. Turney
Designed by Stan Bolt:Architects this project consisted of the construction of a masonry, steel and timber framed private residence with extensive use of low profile sliding glazing and rooflights to give a feeling of light and space. Extensive groundworks were required on a challenging site in order to sit the building within the landscape as well as provide views over the town of Dartmouth and beyond to the River Dart. We provided full pre and post contract Quantity Surveying services. Work was completed in 2019.
© Images Copyright WT Hills Ltd.
|
|
|